![]() However, the aircraft has to be repaired in plant 1200. It is assigned to planning plant 1000 in its master records. The planner creates the order required for repair work and simultaneously also creates a notification for the order. (A) A responsible planner detects damage of a piece of equipment personally. Which of the following Maintenance Order Scenario is supported by SAP Plant Maintenance ? If other measuring points contains the measuring position, change new measuring point and set it with deletion flag. Execute the list display for all measuring points including the newly created one. ![]() (E) Create the new measuring point with the intended measuring position. Create the new measuring point accordingly after that. (D) Execute the list display for measuring points to check whether the intended new measuring position exists in any current measuring points. (C) Create the new measuring point with a characteristic that has Category āUā (Unique Measuring Position). (B) Create the new measuring point with Category āUā (Unique Measuring Position). (A) Create the new measuring point with reference to an existing measuring point. When creating a new measuring point, we like to check whether existing measuring points have similar measuring positions assigned how would you proceed ? PLM305 Structuring and Managing Technical Objects
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |